Wanna Builders

Two did, both younger, both booking a boiler service rather than an emergency. Which is why I think it could work for planned work only. Might try that in spring.

Planned work through a web booking page is probably the same win without a voice at all.

We’re at about 35% won. No idea if that’s good.

For tiling quotes we sit around 40%. When it went over 55% last spring we raised prices 8% and nobody blinked.

Easy for a website. In machining every buyer has a spreadsheet of what parts should cost, and the competition is getting the same tools.

Then keep the price until a competitor forces it down, and spend the saved time on the jobs that win you repeat work. You don’t have to pass it on in advance.

The sanity limit on dimensions is the best bit. We do the same with part sizes: anything bigger than the machine bed gets kicked back.

Fixed lighting is doable. We have a corner of the bench nobody uses.

Too high costs you more, just quietly. Nobody writes in to say they went elsewhere.

We count bar stock the same way, by photo. The ends of bars are easy to count.

29 out of 41 from a photo is better than I’d have guessed.

The slang list is great. We needed one for machinists too: “thou” confused everything.

Mostly features we haven’t made before. I quote those by hand, like always.